Fixed: four water shut off valves, terminal block for GE stove and a kitchen light switch. All this in addition to last week's kitchen faucet, solar water heater panel and main water shut off valve. All this other stuff has been preparation for Next Week, when I'm gonna change the toilets.
Before:

During:


Before:


Before:


Before:


No comments:
Post a Comment