based on my year of birth, my life expectancy as a U.S. male is 75 years. I always thought it was 76. so at 38 years old right now, and still being 38 when I depart for Africa, that means im already past the midpoint of my life 🥴🤮☹😬ğŸ˜ğŸ˜–😠💀
I'm late to my own midlife crisis. how embarrassing.
https://m.youtube.com/watch?v=JwYX52BP2Sk
No comments:
Post a Comment